« Vitr. 5.12 | Vitr. 5.12 | Vitr. 6.0 | About This Work »
4Then, on the water’s edge and at the sides of the platform, let marginal walls be constructed, about one and one half feet thick and brought up to a level with the surface above mentioned; next, let the sloping part be filled in with sand and levelled off with the marginal wall and the surface of the platform. Then, upon this level surface construct a block as large as is required, and when it is finished, leave it for not less than two months to dry. Then, cut away the marginal wall which supports the sand. Thus, the sand will be undermined by the waves, and this will cause the block to fall into the sea. By this method, repeated as often as necessary, an advance into the water can be made.
« Vitr. 5.12 | Vitr. 5.12 | Vitr. 6.0 | About This Work »